1. <cite id="uomqk"></cite>

      <meter id="uomqk"></meter>
      
      

        <code id="uomqk"><samp id="uomqk"><i id="uomqk"></i></samp></code>
      1. 快牙棋牌

        Our Features


        • 90 percent of Mobile Antenna Towers in Kuwait are powered by switchgear manufactured by us. In short, ‘Mobile Communication’ in Kuwait is reliable due to the reliability of our Switchgear.
        • Kuwait’s largest Waste Water and Re-cycling plant at Sulaibiya is powered by our Switchgear.
        • Kuwait’s only Olympic Style Stadium which is a replica of the ‘Olympic Bowl’ at Stuttgart, Germany is energized by our Switchgear.
        • Switchgear which will energize Arraya Tower-II which is the 2nd Tallest Tower in Kuwait, under construction is supplied by us.
        • Entire Emergency System Switchgear at the Ministry of Information Headquarters to ensure noninterruption of critical Television and Radio Broadcasts during Power Failure is manufactured by us.
        • All the equipment in The New Central Fruit and Vegetable Market for the State of Kuwait at Sulaibiya is powered by switchgear designed and manufactured by us.
        • All the Offices and Installations at Kuwait Free Zone are powered by our Switchgear.
        • Critical Equipment at Al Zour Power Station which supplies valuable power to the State of Kuwait are powered by 25 critical MCCs manufactured at our shop floor.
        • Our Switchgear ensure smooth and reliable operations at almost 26 branches of NBK and 10 branches of BKME.
        • Entire Emergency System Switchgear at Kuwait’s Landmark Al Hamra Tower is supplied by us.
        • The Car Park of Kuwait’s Landmark Al Hamra Tower which will facilitate Parking of vehicles of Visitors to the Tower will be powered by Switchgear supplied by us.
        • 50% of MEW Substations which distribute power to the State of Kuwait are themselves powered through Distribution Boards from our State of the Art factory.
        • All the Electrical Equipment of The New 1st Ring Road Project will be energized by Feeder Pillars manufactured and supplied by us.
        • Critical Systems at the New Premature Babies Hospital will be powered by the Emergency Switchgear supplied by us.
        • Critical Systems at the New Chemotherapy Centre for Cancer Patients will be powered by Emergency Switchgear supplied by us.

        快牙棋牌